Monitoring the deployment of rooftop PV at national scale requires a reliable census of grid-connected installations. In France, the ground truth regarding connection data is the TSO's RTE internal registry. Its public counterpart, the RNI (Registre national d'installations), is derived from the internal registry.
But how complete and accurate are these sources, really? This study turns the usual validation logic on its head: instead of using grid-connection data as ground truth to evaluate a remote-sensing method, we show how to estimate a ground truth rooftop PV distribution based on an imperfect census — namely the remote sensing-based detections of DeepPVMapper — to evaluate the accuracy of the connection data regarding rooftop PV systems.
Rooftop PV detected on aerial imagery cannot be compared with a registry as it stands: a detection product contains both false positives and misses (false negatives). The audit's first step is therefore to turn these raw, biased detections into a corrected estimate of installed capacity — one that can serve as an independent reference against which a registry can be checked.
Ecological surveys have long faced the same problem: estimating a true, unknown population size from noisy observations. We apply the same Bayesian logic to reconstruct installed capacity from noisy detections. What we know about the true capacity before seeing any data — the prior — is combined with what the data show — the likelihood — into a posterior distribution that reflects both. Here, the prior is the detector's own error, measured département by département: how many detections are false positives (which sets its precision), and how many real installations it misses (its recall). Precision is estimated by manually reviewing a sample of the pipeline's own detections; recall, by checking whether installations identified independently of the model — via OpenStreetMap and manual annotation of aerial imagery — appear among the detections. Combining the two re-weights each département's detected capacity by its measured precision and recall:
Cadj = (P / R) × Craw
where C denotes rooftop PV installed capacity, and P, R are the precision and recall estimated from the pipeline's own raw detections. Because precision and recall are themselves estimated from a finite annotation sample, each carries its own uncertainty — modelled as a Beta distribution given the counts of true positives, false positives and false negatives observed in that sample. Propagating this uncertainty through the correction is done by simulation: at each of 10,000 draws, a precision and recall value are sampled from their posteriors and applied to the raw detected capacity, which turns a single point estimate into a full posterior distribution over the département's true installed capacity — and therefore a mean value and a 99% credible interval, rather than a single number.
This correction is only interpretable as the true rooftop PV capacity under four estimation assumptions:
Under these four assumptions, it can be showed that the correction converges to the true capacity as the annotation samples grow: more labels buy a tighter, more trustworthy estimate. This is what lets the audit's decision rule — described below — distinguish a genuine registry gap from mere noise in the correction itself.
DeepPVMapper initially identified 589,623 raw detections, totalling 2.90 GWp within the ≤36 kWp perimeter. The Bayesian protocol corrects this into a national estimate of 4.03 GWp [3.96–4.11 GWp, 99% credible interval] and 822,981 installations.
We collected a total of 31,870 points to estimate the precision and recall of the detections and to correct the capacity estimates, with an average of 343 samples per departement. Nationally, the measured pipeline precision was 0.81 (compared to 0.82 on the test set) and the pipeline recall was 0.62 (compared to 0.96 on the test set).
In practice, the correction amounted to increase the estimated count and PV capacity in almost all departements. This is due to the fact that the precision generally exceeds the recall of the pipeline.
The reference against which this corrected estimate is checked is the TSO's own grid-connection data, independently de-duplicated and date-matched to the day: once aligned, it stands at 3.90 GWp. The administrative reporting chain and the calibrated detection pipeline — sharing no input data — converge on the same national figure, agreeing to within 3.3%. This is a full-scale sanity check on the method itself, and the protocol passes it: it demonstrates that a noisy image-based detector can indeed be turned into a calibrated, uncertainty-aware measurement instrument for a quantity as hard to observe as distributed rooftop PV.
This national convergence, however, is only half the picture — and, on its own, it conceals more than it reveals. Averaging over 93 départements can make offsetting local errors disappear into a reassuring national total. Section 4 turns to the local scale, where the two data sources diverge sharply.
At the local scale, the agreement dissolves. 25 geographical units show capacity absent from the TSO's connection data at the 99% credible level, totalling 228.2 MWp (5.7% of the national corrected capacity). Conversely, 8 geographical units display over-capacity in the grid connection data, totalling 99.4 MWp (2.5%). The signal is directional as well as numerical: under-reporting units carry more than twice the capacity of over-reporting ones, and missing capacity dominates the local picture.
This baseline rests on the assumption that detection performance does not depend on installation size; the finding survives independently of it — even under the most conservative pairing of methodological choices, a hard core of 18 geographical units and 172 MWp still remains flagged as missing PV capacity, a lower bound on what the audit identifies. A separate, 7-unit hard core of over-reported units survives the same test, acting as a negative control: it rules out the possibility that the flags are an artefact of the correction procedure rather than a real property of the registry. The gaps are not marginal — in the worst-affected unit, Corse-du-Sud, registry coverage falls to 39% of the estimated fleet (equivalently, it misses 61%).
The public registry inherits the TSO's own gaps, since it is built from the same underlying data — but a second, unrelated mechanism sits on top of them. For privacy reasons, French law requires that municipalities with fewer than ten registered PV systems not be individually disclosed in the RNI; their capacity is folded into a departmental aggregate instead of appearing at the municipal level. This affects 14,019 municipalities, hiding more than 40% of capacity in over 10% of French départements — mostly concentrated in rural areas. This truncation does not remove capacity from the departmental total, but it does remove something the public data cannot recover: the fine-grained detail needed to study rooftop PV's territorial dynamics.
Audited at face value, the RNI therefore looks far less complete than the TSO registry: 32 geographical units are flagged, purely because the privacy rule drops thousands of municipalities with detected PV from the fine-grained view. Correcting for this censoring — reintegrating the hidden capacity at the departmental level — collapses the count to 8 geographical units, all falling within the TSO registry's own hard core. In other words, once the presentational artefact is removed, the public registry's local gaps are exactly the ones already identified in the internal connection data — no more, no less.
Despite a centralised power system, France counts about 130 distribution system operators: one historical incumbent, serves over 90% of municipalities and about 95% of end users, while the remaining municipalities are served by local distribution companies (Entreprises locales de distribution, ELDs), which report to the registry through their own channels. Because this reporting interface can be identified directly in the data, whether crossing it degrades registry completeness can be tested directly — rather than left as speculation.
Comparing municipalities of the same département, ELD-served municipalities show 42% lower registry coverage than municipalities served by the incumbent (38% once municipality size is controlled for). The effect is directionally consistent across every further test: it holds at detection floors of 20, 50 and 100 kWp, and non-parametrically — a Wilcoxon signed-rank test across paired départements finds the coverage gap negative in 16 of 19 départements with sufficient sample (p = 0.0003). Detected capacity itself does not differ between the two groups within a département, which rules out a detection artefact: the gap sits in what gets reported, not in what is actually on the roofs.
This finding lets the audit's most conservative signal of missing capacity be decomposed by cause. A subset of 172 MWp of missing capacity has been isolated. Within this subset, fragmentation accounts for 45% of the missing capacity — 77 of the 172 MWp. The remaining 95 MWp, spread over 12 départements, resists every mechanism tested here: not fragmentation, not a connection-date lag in either direction, nor any other observable factor. Non-declaration and residual registry defects remain open hypotheses — ones for the registry operator to pursue, since the audit has exhausted what can be established from the measurement side alone.
We propose a general framework to estimate the true installed capacity of distributed PV from imperfect measurements. Rather than treating remote-sensing detections or administrative registries as ground truth, the method combines imperfect detection with a bounded amount of independent validation to recover a calibrated estimate of the underlying PV fleet, together with its uncertainty. This distinction matters: reliable capacity estimates are essential for assessing deployment, planning electricity systems, and evaluating the completeness of existing registries, yet administrative connection data can be incomplete or systematically biased.
The approach is designed for reuse across countries and reporting systems. A reporting unit only requires
a raw detected total and a validation sample, while the annotation effort can be budgeted in advance for
a target precision. To maximize reproducibility and reapplicability, we release the estimator as the
standalone Python package bayesian-pv-census, allowing the same statistical procedure to be
applied to new imagery, countries, and administrative datasets without reimplementing the method.
This broader use case is particularly important as rooftop solar expands faster than administrative systems can track it. Where a reliable registry exists, the framework provides an independent audit; where it does not, it can turn imperfect remote-sensing observations into the first statistically calibrated estimate of a PV fleet that has not been reliably counted. In particular in countries such as Pakistan, this framework could be used to estimate a PV capacity from the detections of projects such as EarthPV.